Bathroom Remodel Cost on a Flip: Refresh, Mid-Range or Gut

Bathroom remodel cost per bath at starter rates: refresh $2,100–7,360, mid-range $4,250–15,480, full gut $7,050–24,880, plus hidden items and your offer.

Updated October 21, 20269 min readFlip Investor OS team

In this article
  1. How much does a bathroom remodel cost?
  2. What is in each tier, line by line?
  3. What can a photo of a bathroom not tell you?
  4. How much contingency should a bathroom remodel budget carry?
  5. Which tier do buyers in your price range expect?
  6. How do two baths change the estimate and the maximum offer?
  7. How do you turn a bathroom into estimate lines?

At the app's starter rates (an example base, not market data), the bathroom remodel cost for one 5×8 ft full bath on a flip is $2,100–7,360 for a refresh, $4,250–15,480 for a mid-range remodel and $7,050–24,880 for a full gut, with base figures of $3,930, $8,310 and $13,260. Hidden items such as subfloor rot or a leaking shower pan come on top and stay unpriced until someone sees them.

How much does a bathroom remodel cost?

It depends on the scope, and the scope has three common shapes. A refresh keeps the tub, the tile and the layout and replaces what you can touch. A mid-range remodel replaces the tub and the floor but keeps the walls and the layout. A full gut strips the room to the studs and rebuilds it.

The figures below are priced line by line from the app's starter rates, which Flip Investor OS labels "Starter estimate — not market data" wherever they appear. They are placeholders, not your market's prices, which can be well above or below them.

Tier (one 5×8 ft full bath) What it covers Low Base High
Refresh Reglaze the tub, regrout, new vanity, toilet, lighting, vented fan, GFCI, accessories $2,100 $3,930 $7,360
Mid-range Tear out the tub; new tub and surround, valve, floor tile, plus everything in a refresh except the reglaze and regrout $4,250 $8,310 $15,480
Full gut Demo to studs, tiled shower with a new pan, glass door, floor tile, valve, fixtures, plumbing permit $7,050 $13,260 $24,880

Each step up adds $4,000–5,000 at base. Getting the tier right matters more than finding a cheaper vanity.

What is in each tier, line by line?

Each line is a quantity × a unit price. The low and high totals above use the low and high rates of these same lines.

Line (starter rate, base) Refresh Mid-range Full gut
Tub reglazing $650 — —
Regrout and recaulk $600 — —
Demo to studs — — $1,500
Tub removal — $400 —
Tub / shower with surround — $4,000 —
Tiled shower, walls and pan — — $6,500
Glass shower door — — $1,100
Floor tile, 40 sq ft × $17 — $680 $680
Shower / tub valve and trim — $550 $550
Vanity with top and faucet $1,000 $1,000 $1,000
Toilet $500 $500 $500
Mirror and vanity lighting $350 $350 $350
Exhaust fan vented outside $550 $550 $550
GFCI outlet $160 $160 $160
Towel bars, paper holder, hooks $120 $120 $120
Plumbing permit — — $250
Total at base $3,930 $8,310 $13,260

A GFCI outlet is an outlet that cuts the power when it senses current leaking to ground, which is why it belongs next to water. The gut tier's tiled shower replaces the tub; if you keep a tub there instead, swap that line and the door for the tub line.

Two things are deliberately outside the tiers. Drywall and paint sit in the Floors / Walls / Ceilings zone of the estimate, not in Bathrooms. And moving the toilet or shower to a new spot is its own line, relocating fixtures at $1,500–3,500–8,000, a good reason to keep the layout. The starter base also has a one-line "Full bathroom remodel" at $7,000–12,000–20,000; the line-by-line gut lands close to it and shows where the money goes.

What can a photo of a bathroom not tell you?

Four items decide whether a refresh stays a refresh, and none of them shows in a photo:

  • Subfloor rot. The subfloor is the plywood or boards under the tile that sits on the joists. A slow leak at the toilet or the tub rots it from below. Step on the floor around both; soft means trouble. Starter rate: $6–12–22 per sq ft, so $480 at base for a 40 sq ft floor, more if the joists are involved.
  • Supply lines and drains in the wall. Supply lines are the pipes that bring water to the fixtures. Galvanized steel and polybutylene fail from the inside. A local repair is $250–800–2,500 at the starter rates, a drain line $400–1,000–2,500, and a whole-house repipe $5,000–9,000–16,000 if the bath is only where you noticed it.
  • Venting. A fan that runs is not a fan that vents outside; some blow into the attic. The fix is in every tier above. The damage it may have left on the roof deck or in the walls is not: mold remediation is $1,500–3,500–9,000, testing $300–500–900.
  • The shower pan. The shower pan is the waterproof layer under a tiled shower floor that carries water to the drain. A leaking pan looks fine from above. Keep an old tiled shower in a refresh, and you carry the risk of a $3,500–6,500–12,000 replacement later.

The walk-through checklist covers what to press, run and photograph in the bathrooms zone. In Flip Investor OS, Field AI reads the zone's photos and sorts them into what is visible (cracked grout, a dated vanity), what is possible (a soft spot by the toilet may be subfloor rot) and what cannot be verified from a photo (the pan, the pipes in the wall, where the fan ends). It never prices anything, and nothing enters the estimate until you confirm it.

How much contingency should a bathroom remodel budget carry?

Contingency is a reserve on top of the estimate for what you find once the work starts. Flip Investor OS adds 10% of the repair estimate by default, for the whole deal, and you can change it.

Contingency is not where unknown lines go. If you know the subfloor needs work but not how much, that is a line in the estimate marked Unpriced, and the estimate shows as Incomplete until it has a number. The contingency covers what you did not know to list, not what you listed and skipped. A refresh over 1978 tile hides more than a gut, so a higher reserve on an old bath can make sense; the number is yours.

Which tier do buyers in your price range expect?

Your comps answer this. The after-repair value (ARV), what the house should sell for once the work is done, comes from three to five recent sales of similar houses nearby. Open their listing photos and look at the baths. That is the standard your house is priced against.

  • If the comps have new tile, new vanities and glass doors, a reglazed tub may not reach that ARV. Either the scope goes up or the ARV comes down.
  • If the comps have clean, dated baths, a gut spends money the sale does not pay back.
  • If every comp keeps a tub in the hall bath, keep one too.
  • The starter base has a high-end full remodel at $18,000–30,000–50,000. Check whether any comp at your ARV has that kind of bath before you price one.

The tier and the ARV must describe the same finished house. How to calculate ARV covers choosing and adjusting the comps.

How do two baths change the estimate and the maximum offer?

The example house used across this site is 1,600 sq ft, 3 bed 2 bath, built in 1978, with an ARV of $320,000 and a $48,000 repair estimate. That estimate carries $8,500 for the two baths, a refresh on both: $4,250 a bath, inside the refresh range. Here is what happens when the walk-through finds more.

The maximum offer here is the highest price at which the profit still equals the target, every cost counted: cash purchase, 10% contingency, 2% purchase closing costs, $9,000 of holding, 6% selling costs ($19,200) and a target profit of 10% of ARV ($32,000).

Maximum offer (cash) = (ARV − Selling costs − Holding − Rehab × 1.10 − Target profit) ÷ 1.02
Each $1,000 of bath work ≈ $1,078 off the maximum offer (1,000 × 1.10 ÷ 1.02)
Scenario Bath lines Rehab estimate With 10% contingency Maximum offer (cash)
Both baths refreshed (the estimate as it stands) $8,500 $48,000 $52,800 $202,941
Hall bath mid-range, second bath refreshed $8,310 + $4,250 = $12,560 $52,060 $57,266 $198,562
Both baths gutted 2 × $13,260 = $26,520 $66,020 $72,622 $183,507
Both gutted, subfloor not yet priced $26,520 + Unpriced Incomplete — Not shown until priced

Check the middle row: 320,000 − 19,200 − 9,000 − 57,266 − 32,000 = 202,534; ÷ 1.02 = $198,562. The app shows the same figures, rounded down to the whole dollar.

Gutting both baths instead of refreshing them adds $18,020 to the estimate and takes about $19,400 off what you can pay. The last row matters most: with a line still Unpriced, Flip Investor OS does not show a maximum offer built on a hole; it shows what is missing. Typing $0 for the subfloor would have shown $183,507 and been wrong in the direction that makes you overpay. To run your own house: open the free calculator. The 70% rule gives a rougher figure for comparison.

How do you turn a bathroom into estimate lines?

Start from the zone, not a total: photos of the tub or shower, the floor at the toilet, the vanity, the fan and the ceiling, plus the size of each bath.

Then build the lines: pick the tier from the comps, price each line from your own rates if you have them or the starter rates until you do, and add a line with no price for every item you could not verify. When contractor bids arrive, compare them line by line with the estimate; a bid that is cheaper because it left out the valve is not cheaper. Rehab cost per square foot shows where the whole-house figure fits before the line-by-line estimate replaces it.

Costs vary by market, and starter rates are a placeholder. What does not vary: an unknown line stays Unpriced, never $0.

Frequently asked questions

How much does it cost to remodel a bathroom?
It depends on the scope far more than on the room. At the starter rates used in this article, which are an example base and not market data, one 5×8 ft full bath costs about $3,930 to refresh, $8,310 for a mid-range remodel with a new tub and floor tile, and $13,260 to gut to the studs, at base. Low and high run from $2,100 to $24,880. Your market, your trades and your finish level move these figures.
Is there a bathroom remodel cost estimator or calculator that is accurate?
An estimator is only as good as its line list. A reliable bathroom remodel estimate is a list of items, each with a quantity and a unit price: tub, valve, tile by the square foot, vanity, toilet, fan, outlets, permit. A single per-bath figure hides the scope. Price the lines from your own contractors' numbers when you have them, and leave anything you could not see unpriced instead of guessing.
What is the most expensive part of a bathroom remodel?
Usually the shower or tub. At the starter rates a tiled shower with its pan is $3,500–6,500–12,000 and a new tub with a surround $2,000–4,000–7,500, more than the vanity, toilet and lighting together. Moving fixtures to a new spot adds $1,500–3,500–8,000 for the plumbing alone, a good reason to keep the layout.
Should I gut the bathroom on a flip or just refresh it?
Look at the comps that set your after-repair value. If their baths have new tile and fixtures, a refresh may not reach that price; if they have reglazed tubs and fresh caulk, a gut spends money the sale does not pay back. Also look for soft floors, loose tile and stains: those can force a gut whatever the comps show. The choice is yours; the numbers show what each one costs.
Can I refinish a bathtub instead of replacing it?
Often, if the tub is sound and the wall around it is dry. Reglazing is $400–650–1,100 at the starter rates against $2,000–4,000–7,500 for a new tub with a surround. It does not fix a leaking valve, a rotten floor under the tub or a surround that lets water into the wall, so check those first.
How much contingency should I add to a bathroom remodel budget?
Flip Investor OS uses 10% of the repair estimate by default for the whole deal, and you can change it. A refresh that keeps an old tiled shower carries more unknowns than a gut that replaces everything, so you may want a higher reserve on an older bath. Whatever the figure, keep it separate from the estimate so you can see when it is being spent.

Put it to work

Take your next house through Flip Investor OS

Walk it on your phone, price the rehab with no $0 placeholders, see your maximum offer, and track the project against the original plan. Fourteen days free.

Written by the Flip Investor OS team. Every formula here is the one the app runs; nothing is a recommendation to buy or not to buy.